IEC QUALITY ASSESSMENT SYSTEM (IECQ)
covering Electronic Components, Assemblies, Related Materials and Processes
For rules and details of the IECQ visit www.iecq.org |
IECQ Certificate of Conformity
Distributor
|
IECQ Certificate No.: | IECQ-P VDE 12.0002 | Issue No.: | 3 | Status: | Current |
|
Supersedes: | IECQ-P VDE 12.0002 Issue 2 | Issue Date: | 2018/09/14 | Org. Issue: | 2012/10/16 |
CB Reference No.: | 5004960/D/IECQ/DE | Expiration: | 2021/09/14 |  |  |
|
BADER GmbH & Co. KG
Von-Hünefeld-Str. 35
50829 Köln
Germany
|
The organization has developed and implemented procedures and related processes which have been assessed by the IECQ Certification Body issuing this certificate and found to comply with the applicable requirements of the IECQ Approved Process Scheme which is in accordance with the Basic Rules IECQ 01 “Rules of Procedure”, IECQ 03-1 “IECQ General Requirements for all Schemes” & IECQ 03-2 "IECQ Approved Process Scheme" of the IEC Quality Assessment System for Electronic Components (IECQ), and in respect of standard(s) or specification(s):
|
|
- ISO 9001:2015 {2015} Quality management systems - Requirements
|
Process Manual Reference: | Manual No. 2, dated 4 July 2018 |  |
|
 |
|
Scope of Activity: |  |  |  |
Distribution of electronic components |
Issued by the Certification Body: VDE Testing and Certification Institute |
Merianstrasse 28 63069 OFFENBACH
Germany
Authorised Person: Dr. Kreß
|  | |
|
The validity of this certificate is maintained through on-going surveillance audits by the IECQ CB issuing this certificate. This Certificate of Conformity may be suspended or withdrawn in accordance with the
Rules of Procedure of the IECQ System and its Schemes.
This certificate and any schedule(s) may only be reproduced in full.
This certificate is not transferable and remains the property of the issuing IECQ CB.
The Status and authenticity of this certificate may be verified by visiting www.iecq.org.
|  |
|
IECQ-P Rev. 05
- Attached Translation: none [ Add ] |